Integrated Health Projects is an established joint venture between VINCI Construction UK Limited and Sir Robert McAlpine Limited.

‘Ground breaking day’ for the BEACH Building at the Royal Bournemouth Hospital

5th November 2021

‘Ground breaking day’ for the BEACH Building at the Royal Bournemouth Hospital

On 3rd November 2021, The Royal Bournemouth Hospital hosted a ground breaking ceremony to mark the start of The BEACH Building’s construction. This was in the presence of representatives from University Hospitals Dorset NHS Foundation Trust (UHD) and the main contractor Integrated Health Projects (IHP). The latter is a joint venture between VINCI Building and Sir Robert McAlpine.

The BEACH Building

The BEACH Building is 23,000m2 of complex hospital development over six storeys - equivalent to 115 tennis courts. It provides a new maternity unit, children’s unit, enhanced emergency department and critical care unit. This will enable the Royal Bournemouth Hospital to become the major emergency hospital for Dorset.

The ceremony marked the preparation of the first of 515 pile positions that support the foundations of The BEACH Building.

A Bagpipe player led around 50 guests to the construction site, where IHP representatives gifted tankards to Pankaj Davé, chair of UHD’s Transformation Committee, before breaking ground on the construction site.

Richard Renaut, UHD’s Chief Strategy and Transformation Officer, said: “This is a ground-breaking day in many ways as we celebrate what is a significant milestone for our local NHS and the patients we serve.

“The establishment of The BEACH Building represents significant investment and commitment by the NHS.

“It will be a modern, sustainable building, providing high quality facilities for our existing services, allowing our clinical teams to improve the way we deliver the services within it.

“On behalf of our Board I’d like to thank all the team effort for getting us to this stage today.”

Ian Cheung, Managing Director South, Sir Robert McAlpine, said: “I am proud that we have reached this important milestone and that we have kept on track with enabling the scheme, despite the impact of the Covid-19 pandemic. This is testament to the great engagement, commitment and support from UHD, the IHP project team, and local industry. I look forward to delivering this state-of-the-art healthcare facility to serve the communities in Dorset.”

Jason Griffiths, VINCI’s Regional Director for London and South, said: “This project represents exactly what the IHP Joint Venture was formed to deliver. Through our technical expertise and leadership, our aim is to deliver this outstanding healthcare scheme using Modern Methods of Construction (MMC), constructing offsite where possible, and in a sustainable manner which minimises the impact on the environment.”

The construction work has been designed to minimise disruptions to the Royal Bournemouth site over the duration of the project. The BEACH Building is planned to open in Autumn 2024 and forms part of the £250m transformation of UHD’s hospitals, including investment to develop Poole Hospital as the major planned care hospital and ambitious plans for Christchurch Hospital.

Latest news

Triple win for IHP team
4th November 2021

Triple win for IHP team

Yesterday was an exciting day for the IHP team, as they were announced triple award-winners at the national Building Better Healthcare Awards.

IHP proud sponsors of the European Healthcare Design Awards
3rd November 2021

IHP proud sponsors of the European Healthcare Design Awards

IHP (the alliance between VINCI Building and Sir Robert McAlpine) have been proud sponsors of the European Healthcare Design awards for the last 5 years.

Sir Robert McAlpine giving back with Strong Foundations Grant
20th September 2021

Sir Robert McAlpine giving back with Strong Foundations Grant

It’s all part of their Strong Foundations Grant initiative which aims to help them give back to the communities closest to their projects and offers their people the chance to choose where the funds are distributed.